Kraftwerke Mainz-Wiesbaden AG

New construction of gas pressure control and measuring plant “Kastel 4”





Project description:
New construction of the gas pressure control and measuring plant including foundation and buildings, as well as the exterior facilities.

Building dimensions:
Measuring and control room: 13,0 x 5,3 x 14,0 m
Heating room: 10,0 x 3,0 x 7,0 m
Electrical room: 7,0 x 3,0 x 3,0 m

 

Service description:
Measuring and control room: 13.0 x 5.3 x 14.0 m
Heating room: 10.0 x 3.0 x 7.0 m
Electrical room: 7.0 x 3.0 x 3.0 m

Plant layout:

  • 2 standing filter units in the outside area in the entrance of the plant, inlet pipe DN 400, DP 70.
  • Division of the plant input DN 400 into 2 measuring sections (1 x municipal gas supply, 1 x power plant supply) DN 300.
  • Division of the respective measurement over 2 regulators, including pre-heating.
  • 1 x output to power plant supply.
  • 1 x output to municipal gas supply
  • 2-track heating gas regulation.
  • Layout of the heating consisting of 2 x boilers with 1,400 KW and one boiler with 700 KW.
  • incl. measuring and control and electrical equipment of the buildings.

 

Client: Kraftwerke Mainz-Wiesbaden AG
Period: Nov. 2007 – Oct. 2008
Medium: Natural gas